PP/PS Plastic Cup Lid Machine

Product Details
Customization: Available
After-sales Service: One Year
Warranty: One Year
Manufacturer/Factory & Trading Company

360° Virtual Tour

Diamond Member Since 2004

Suppliers with verified business licenses

Audited Supplier

Audited by an independent third-party inspection agency

High Repeat Buyers Choice
More than 50% of buyers repeatedly choose the supplier
Exhibition Experience
The supplier had participated in offline trade shows, you can check the Audit Report for more information
Fast Delivery
The supplier can deliver the goods within 30 days
Quality Assurance
The supplier provides quality assurance
to see all verified strength labels (23)
  • PP/PS Plastic Cup Lid Machine
Find Similar Products

Basic Info.

Model NO.
CY-450G
Name
Automatic Plastic Lid Making Machine
Model
Cy-450g
Measurement
2650X1100X1700mm
Weight
1200kgs
Air Pressure
0.5-0.7MPa
General Power
4kw
Speed
15-35 Times/Min
Material Request
PVC/Pet/HIPS/PLA
Max Width
150mm
Max Length
450mm
Transport Package
Wooden Case(PP/PS Cup Lid Machine)
Specification
CE(pp/ps cup lid machine)
Trademark
LIFENG(pp/ps cup lid machine)
Origin
Zhejiang, China(PP/PS Cup Lid Machine)
HS Code
8441309000
Production Capacity
60sets/Month(PP/PS Cup Lid Machine)

Product Description

A.CHARACTERISTIC

CY-450G automatic plastic cup lid forming machine can make kinds of plastic lids in different plastic material and shapes.this machine is automatic plastic lid forming machine,finish thermoforming,hole punching die cutting on one machine,widely usei n PET/PVE/HIPS plastic lids

B.MACHINE ADVANTAGE:

general power:4kw
material request: PVC/PET/HIPS/PLA
max width: 150mm
max length:450mm
max depth: 46mm
air pressor: 0.5-0.7MPA
weigth: 1200kgs
speed : 15-35times/min
dimension: 2650*1100*1700mm

C.COMPANY OTHER REALATED MACHINE:

We also have paper plate machine, paper die cutting machine, paper cone sleeve machine, paper bowl machine etc

D.Packing details

Our machine will PE packed with woodencase,

E.AFTER SERVICE

1.Warranty:1 year
2.The guide booklet will be sent with machine to guide the installation
Process works, adjust the whole machine, production, avoide or solve the
Problem which the buyer will face.
3.We will adjust the machine well for one week before the delivery, ensure
The machine has the perfect performance.
4.We can dispatch technologists to buyer's factory, guiding installation,
Ajustment for a period, the buyer incharge of the salary, traffic fee, boarding
And lodging, communication and each day 100USD living allowances.
5.We supply the free training of buyer, the training won't stop until the buyer control the whole leson!The cost of air ticket, boarding and lodging should
Provided by buyer.
6.We supply the consumable spare parts for free for one year use.
 

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now
Contact Supplier