| Customization: | Available |
|---|---|
| Warranty: | One Year |
| Applicable Objects: | Beverage |
| Shipping Cost: | Contact the supplier about freight and estimated delivery time. |
|---|
| Payment Methods: |
|
|---|---|
| Support payments in USD |
| Secure payments: | Every payment you make on Made-in-China.com is protected by the platform. |
|---|
| Refund policy: | Claim a refund if your order doesn't ship, is missing, or arrives with product issues. |
|---|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
High degree of automation: PLC control system and touch screen operation interface are adopted, with encoders, sensors and other components, to accurately control the ultrasonic sealing, hot air sealing and other processes, reduce manual intervention and improve production efficiency.
Core component optimization: open cam and gear motor design, with oil pump automatic lubrication and filtration system, reduce mechanical wear and make maintenance more convenient.
Ultrasonic cup body sealing: ultrasonic technology is used to achieve cup body sealing, with high sealing quality and fast speed, which can be adapted to single PE or double PE coated paper to meet the production needs of cold and hot drink cups.
| Model |
LF-110 |
| Paper bowl Size |
Bottom:48-70mm Top: 70-95mm Height: 60-135mm |
| Raw Material |
One-side or two-side PE coated paper(Singe PE or Double PE coated paper) |
| Speed | 100-110pcs/min |
Suitable paper weight |
170-350gsm |
Voltage supply |
380v50hz 3-phase *If user's voltage supply is different, please inform us in advance. |
| Working Air Source | Air pressure 0.6-0.8mpa 0.4m3/min User should buy Air Compressor |
| General power | 16kw |
| Net weight | 1800kgs |
| Measurement (mm) | 2500*1100*1500 |
| Cup Side Sealing | EVERGREEN Ultrasonic |
We can customize machine and mold according to customer's requirement. |
|
H our work shop
The machine is at the customer's factory.
FAQ
Q1: if the machine break down overseas, what is the effecient to solve the problem?
A1: Basially , the machine is easy to operate, the engineer can teach the client how to fix the machine by video or email. And the engineer are available to overseas.
Q2: The payment, MOQ, producing period and delivery time?A2: T/T 30 % as the deposit, and the balance payment should be paid before delivery.
MOQ is 1 set.
The producing time is 25 days after deposit.
The delivery time is within 5 days after balance payment.
Q3: How to get my company?
A3: The address: 7# building , Yongding Road, Songjiadai Industril Zone, Feiyun Town , Ruian city.
If you want to visit my company, please send your ticket information to my skype or email. I will meet your in the Wenzhou Longwan Airport.
Contact information: