| Customization: | Available |
|---|---|
| Warranty: | One Year |
| Applicable Objects: | Beverage |
| Shipping Cost: | Contact the supplier about freight and estimated delivery time. |
|---|
| Payment Methods: |
|
|---|---|
| Support payments in USD |
| Secure payments: | Every payment you make on Made-in-China.com is protected by the platform. |
|---|
| Refund policy: | Claim a refund if your order doesn't ship, is missing, or arrives with product issues. |
|---|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Good news of high speed machine
| Model |
LF-110 |
| Paper bowl Size |
Bottom:48-70mm Top: 70-95mm Height: 60-135mm |
| Raw Material |
One-side or two-side PE coated paper(Singe PE or Double PE coated paper) |
| Speed | 110-120pcs/min |
Suitable paper weight |
170-350gsm |
Voltage supply |
380v50hz 3-phase *If user's voltage supply is different, please inform us in advance. |
| Working Air Source | Air pressure 0.6-0.8mpa 0.4m3/min User should buy Air Compressor |
| General power | 16kw |
| Net weight | 1800kgs |
| Measurement (mm) | 2500*1100*1500 |
| Cup Side Sealing | EVERGREEN Ultrasonic |
We can customize machine and mold according to customer's requirement. |
|



Ruian Lifeng Machinery Co., Ltd (old name: Ruian Sincere Machinery Co., Ltd. ) is a manufactory specialize in producing series of automatic machinery for paper contaciners like paper cup making machine, paper bowl forming machine, ice cream cone sleeve machine, die punching machine etc. Especially the water cone cup machine, we get the patent in China. And all of our products have past CE, SGS. In last 20years, we exported to all of the world and get good feedback from our customers.
FAQ
Q1: if the machine break down overseas, what is the effecient to solve the problem?
A1: Basially , the machine is easy to operate, the engineer can teach the client how to fix the machine by video or email. And the engineer are available to overseas.
Q2: The payment, MOQ, producing period and delivery time?A2: T/T 30 % as the deposit, and the balance payment should be paid before delivery.
MOQ is 1 set.
The producing time is 25 days after deposit.
The delivery time is within 5 days after balance payment.
Q3: How to get my company?
A3: The address: 7# building , Yongding Road, Songjiadai Industril Zone, Feiyun Town , Ruian city.
If you want to visit my company, please send your ticket information to my skype or email. I will meet your in the Wenzhou Longwan Airport.